Monday, February 27, 2012

LESSON PLAN
Kevin Scheib (Wood Shop and Plastics Technology) weekly lesson plans (2/26/2012-2/30/2012)
Monday 2/26

Pd. 1,4,7 Basic Wood: Students will be working on individual projects. We will be tapering legs for tables.

Pd. 5 Advanced Cabinetmaking: Students will be working on individual projects. I will be giving a demonstration on cutting hinge gains for doors.

Pd. 2,3 Plastics Technology: Students will be working on cutting and sanding parts for the Kayak. All students must take a active part in this project in order to receive credit for the day.
Tuesday 2/27

Pd. 1,4,7 Basic Wood: Students will be working on individual projects. I will be giving a demonstration on laying out the holes for mortise and tannon joints.

Pd. 5 Advanced Cabinetmaking: Students will be working on individual projects.

Pd. 2,3 Plastics Technology: Students will continue processing parts. We will also be working on the mold injector projects at the same time so students will have a chance to make some plastic projects with this machine.
WENDNESDAY 2/28

Pd. 1,4,7 Basic Wood: I will be giving a demonstration on using the Mortis and Tennon machine.

Pd. 5 Advanced Cabinetmaking: Students will be working on individual projects.

Pd. 2,3 Plastics Technology: Students will continue processing parts. We will also be working on the mold injector projects at the same time so students will have a chance to make some plastic projects with this machine.
Thursday 2/29

Pd. 1,4,7 Basic Wood: Students will be working on individual projects. I will be going around the shop and working individually with students.

Pd. 5 Advanced Cabinetmaking: Students will be working on individual projects.

Pd. 2,3 Plastics Technology: Students will continue processing parts. We will also be working on the mold injector projects at the same time so students will have a chance to make some plastic projects with this machine.
Friday 2/30

Pd. 1,4,7 Basic Wood: Students will be working on individual projects

Pd. 5 Advanced Cabinetmaking: Students will be working on individual projects.

Pd. 2,3 Plastics Technology: We will start to assemble parts for the kayak.
FOR ALL PERIODS:
PA. Standards (Science & Technology); 2.1, 2.2, 2.3, 3.2, 3.4, 3.6,
Objectives; Wood shop-To have students fully understand process of how to use different types of measuring devices and how to measure accurately. Students will also learn safe and acceptable procedure for the shop.
Plastics- To have students fully understand process of how to use different types of measuring devices and how to measure accurately. Students will also learn safe and acceptable procedure for the shop.
Assessments; Will be done by Question and Answers and Quiz.

Tuesday, February 21, 2012

LESSON PLAN
Kevin Scheib (Wood Shop and Plastics Technology) weekly lesson plans (2/20/2012-2/24/2012)
Monday 2/20 No School For Students

Pd. 1,4,7 Basic Wood:

Pd. 5 Advanced Cabinetmaking:

Pd. 2,3 Plastics Technology:

Tuesday 2/21

Pd. 1,4,7 Basic Wood: We will do a review of projects after the time off to make sure students know what they are doing. Students will then get to work on individual projects.
Pd. 5 Advanced Cabinetmaking: Students will continue with projects.

Pd. 2,3 Plastics Technology: We will be staining the wooden parts for the chess set box.

WENDNESDAY 2/22

Pd. 1,4,7 Basic Wood: Students will be working on individual projects.

Pd. 5 Advanced Cabinetmaking: Students will continue with individual projects and I will be giving student’s assistance as needed.
Pd. 2,3 Plastics Technology: We will start to assemble Boxes and then we will continue with the kayak project. We will be able to only assemble approximately 6 boxes a day do to the limited clamps.
Thursday 2/23

Pd. 1,4,7 Basic Wood: Students will continue with individual projects.

Pd. 5 Advanced Cabinetmaking: Students will continue with individual projects.

Pd. 2,3 Plastics Technology: We will continue with the chess box assembly. And move on to the kayak project.
Friday 2/24 I will Be Out with ½ Personal Day

Pd. 1,4,7 Basic Wood: Students will continue to work on individual projects. I will be going around to each student and checking on progress.
Pd. 5 Advanced Cabinetmaking: Students will continue to work on their individual projects.

Pd. 2,3 Plastics Technology: We will continue with assembly of Boxes. We should finish them today.
FOR ALL PERIODS:
PA. Standards (Science & Technology); 2.1, 2.2, 2.3, 3.2, 3.4, 3.6,
Objectives; Wood shop-To have students fully understand process of how to use different types of measuring devices and how to measure accurately. Students will also learn safe and acceptable procedure for the shop.
Plastics- To have students fully understand process of how to use different types of measuring devices and how to measure accurately. Students will also learn safe and acceptable procedure for the shop.
Assessments; Will be done by Question and Answers and Quiz.

Monday, February 6, 2012

LESSON PLAN
Kevin Scheib (Wood Shop and Plastics Technology) weekly lesson plans (2/6/2012-2/10/2012)
Monday 2/6

Pd. 1,4,7 Basic Wood: We will be picking lumber out and planning lumber down to size. Each student will have their own individual project.
Pd. 5 Advanced Cabinetmaking: Students will be working on the individual projects.

Pd. 2,3 Plastics Technology: We will be working on the chess boards and we will be making the wood cases for the chess set.
Tuesday 2/7

Pd. 1,4,7 Basic Wood: We will continue to hand out lumber to students and the will start to process the lumber into project parts.
Pd. 5 Advanced Cabinetmaking: Students will be working on the individual projects.

Pd. 2,3 Plastics Technology: We will continue to work on the wood box for the case . Some students will be working on making the coin purse project.
WENDNESDAY 2/8

Pd. 1,4,7 Basic Wood: Students will be working on own projects. We will still be handing lumber out to some students. Others will start processing lumber. I will be going around to each student and helping them getting started on what parts should be done.
Pd. 5 Advanced Cabinetmaking: Students are working on their own projects and I will be going around and checking progress and helping students as needed.
Pd. 2,3 Plastics Technology:
Thursday 2/9

Pd. 1,4,7 Basic Wood: Students will be working on their own projects. I will be stressing the importance of following instructions that are given with the project plans or that are given by me.
Pd. 5 Advanced Cabinetmaking: Students will be working on their own projects.

Pd. 2,3 Plastics Technology: We will be finishing up any pouring of chess pieces and students should be finish any sand blasting that is need on the chess board. We will also be working on the box for the chess boards.
Friday 2/10

Pd. 1,4,7 Basic Wood: Students should know have all the wood needed to get them started on their projects. They will be working independently unless there are more than one student making the same project. Those students may work as a group.
Pd. 5 Advanced Cabinetmaking: Students will be working on their own projects.

Pd. 2,3 Plastics Technology: We will be working on the chess board box. We will be staining the chess board boxes.
FOR ALL PERIODS:
PA. Standards (Science & Technology); 2.1, 2.2, 2.3, 3.2, 3.4, 3.6,
Objectives; Wood shop-To have students fully understand process of how to use different types of measuring devices and how to measure accurately. Students will also learn safe and acceptable procedure for the shop.
Plastics- To have students fully understand process of how to use different types of measuring devices and how to measure accurately. Students will also learn safe and acceptable procedure for the shop.
Assessments; Will be done by Question and Answers and Quiz.