Wednesday, November 13, 2013

1st Pd. Basic Wood Working Class- They are in the process of building a Three Shaker Peg Shelf. Students are doing a very good job. We will be done with this project by 11/22/2013. Students will get to choose the color of stain and then they will be clear coating them. 2nd. Pd. Basic Wood Working Class- Students are in the process of building step stools. They are being made out of Poplar wood and are very strong. Students are doing a good job and projects are looking good. Students will have their chose of stain for their stools and then they will be clear coating. I expect to be done with this project by 11/23/2013 4th Pd. Basic Wood Working Class- Students are in the process of building step stools. They are being made out of Poplar wood and are very strong. Students are doing a good job and projects are looking good. Students will have their chose of stain for their stools and then they will be clear coating. I expect to be done with this project by 11/23/2013 5th. PD. Plastics- Students are working on making Salt and Pepper shakers. We will be done with this project by 11/14/2013. The next project we will be making is the clip board. Students are required to bring some sort of picture for this project. It will be placed inside the clip board. 6rth. PD. Advanced Cabinet Making- Students are working on individual projects. 7th. PD. Basic Wood Working Class-- Students are in the process of building step stools. They are being made out of Poplar wood and are very strong. Students are doing a good job and projects are looking good. Students will have their chose of stain for their stools and then they will be clear coating. I expect to be done with this project by 11/23/2013